Andreas Wibowo

Prof. (R) Dr. Ing. Habil. Andreas Wibowo, S.T., M.T.
andreas_wibowo@unpar.ac.id


Pendidikan | Educational Background

Sarjana | Bachelor Degree:Institut Teknologi Bandung, Indonesia (1995)
Magister | Master Degree:Institut Teknologi Bandung, Indonesia (1998)
Doktor | Doctoral Degree:Technische Universität Berlin, Jerman (2005)
Habilitation | Habilitation:Bauhaus Universität Weimar, Jerman (2016)

Bidang Penelitian | Research Interest

  • Kemitraan Publik-Swasta
    Public-Private Partnership
  • Manajemen Risiko
    Risk Management
  • Teknik Finansial
    Financial Engineering
  • Manajemen Biaya
    Project Planning And Controlling
  • Perencanaan dan Pengendalian Proyek
    Project Management
  • Manajemen Proyek
    Project Management
  • Keuangan Proyek
    Project Finance
  • Ekonomi Konstruksi
    Construction Economics
  • Pengadaan Umum
    Public Procurement
  • Teori Pengambilan Keputusan
    Decision-Making Theories

Mata Kuliah yang Diajarkan | Taught Courses

  • Penjadwalan Proyek Konstruksi
    Construction Project Scheduling
  • Tugas Akhir
    Final Project
  • Estimasi Biaya Konstruksi
    Construction Cost Estimation
  • Teori Pengambilan Keputusan dalam Konstruksi
    Decision-Making Theories in Construction
  • Manajemen Risiko
    Risk Management
  • Manajemen Air Perkotaan di Negara Berkembang
    Urban Water Management In Developing Countries
  • Manajemen Biaya
    Cost Management
  • Tesis
    Thesis (Master Program)
  • Manajemen Proyek Lanjut
    Advanced Project Management
  • Disertasi
    Dissertation

Publikasi | Publication

Jurnal Internasional | International Journal

  • Wibowo, A., Sundermeier, M. (2020). “Developing a Fuzzy Value-for-Money Analysis Model for Annuity-Based Public-Private Partnership Infrastructure Projects under Consideration of Risk Mitigation Capability.” ASCE Journal of Construction Engineering and Management, Vol. 146, No.7.
  • Wibowo, A. (2019). “Determining Reasonable Bid Ratios under Two-sided Power Distribution Assumption for Public Procurement under Capped Lowest-Cost Bidding System.” International Journal of Procurement Management, Vol. 12, No. 2, 177–198.
  • Sihombing, L., Latief, Y., Rarasati, A.D., Wibowo, A. (2018). “Utilizing Uncertainty Management to Analyze the Uncertainty of Toll Road Land Acquisition.” International Journal of Civil Engineering and Technology, Vol. 9, No. 6, 1221–1228.